Joshua Tree, CA

Cascade Solar Park

Project Summary

Rosendin provided complete engineering, procurement and construction services for the installation of an electric, solar energy system on 150 acres at the Cascade Solar Project located in Joshua Tree, CA. Before construction, tortoise fencing was installed around the site to protect the indigenous Desert Tortoise, and other wildlife and the project was required to employ archaeologists and geologists on site, at all times, to protect the historical significance of this property to Native Americans. The Arizona Desert Monsoon with rain, wind, and dust added to the challenges that had to be overcome by Rosendin to deliver this project in 66 working days; on time and under budget.

Cascade Solar Park

The Cascade Solar Park project was completed in 66 days while preserving wildlife and sites of historic significance.

Location
Joshua Tree, CA
Client
Sun Edison, LLC
Duration
15 Months
Budget
$16,677,502
Size
24 MW

Project Facts

24MW

DC Flat Panel System

66

Working Days to Completion

150

Acre Footprint

Case Study

Cascade Solar is a 24 MW single-axis tracker system utilizing crystalline modules, located on 150 acres in Joshua Tree, California. Rosendin successfully met the demands of an accelerated schedule, completing the project within 66 working days.

Project Challenges
Site Conditions
Project Schedule
Historic Site